Design-Build Delivery for Commercial and Residential Projects

Design-build puts drawings and construction under one accountable party. That removes the most common source of change orders: a design nobody priced until it was too late to change. One design build contractor holding both halves removes the gap where a contractor blames the drawings and a designer blames the build.

What this covers

  • Single-contract delivery
  • Early cost modelling
  • Constructability review
  • Permit and construction under one team
  • Guaranteed line-item budgets

How we run it

  1. 01

    Validate

    Program, budget and site tested together before drawings.

  2. 02

    Design to budget

    Cost model updated at every design milestone.

  3. 03

    Permit

    Approvals pursued while long-lead procurement starts.

  4. 04

    Build

    One team, one schedule, one line-item budget.

Questions people ask before hiring

Is design-build cheaper than design-bid-build?

Not always cheaper on paper, but usually cheaper in outcome. Design-bid-build can produce a sharper hard bid when scope is fully defined. Design-build tends to compress schedule and reduce the change orders that come from drawing gaps.

Which delivery method should I use?

We advise on delivery during feasibility rather than defaulting to one. Fully defined scope with no schedule pressure favours design-bid-build. Speed, complexity or an occupied building favours design-build.