Plantek West
Rooftop accessory dwelling unit with outdoor living space at sunset

Start here

Feasibility first, so nobody designs a project that cannot be built

Every Plantek West engagement can start with a paid feasibility study. It tests what the property allows, what it will cost, which approvals it needs and how long they take, then gives you a written recommendation. If the answer is no, you learn that for the price of a study rather than the price of a design. Feasibility comes first because nobody designs their way out of a site that cannot carry the project, and because the cheapest moment to change your mind is before anyone designs anything.

Eight feasibility entry points

The study is scoped to the decision you are actually making, whether that is buying land, splitting a lot, signing a lease or adding an ADU behind a house.

The study is step one of six, not a separate exercise

Most firms do one link in this chain and hand you off. Everything the study establishes carries forward into design, permits, cost and the field.

  1. Step 1

    Feasibility

    Can it be built, what will it cost, what approvals does it need, how long will it take.

  2. Step 2

    Design

    Drawings developed against a live cost model, not priced afterwards.

  3. Step 3

    Permitting

    Submittals, corrections and agency clearances run by us.

  4. Step 4

    Preconstruction

    Constructability, procurement, phasing and schedule before mobilisation.

  5. Step 5

    Construction

    One line-item budget and one accountable team in the field.

  6. Step 6

    Project management

    Cost, schedule, change and closeout control through handover.

Feasibility questions, answered

Why does Plantek West start with a paid feasibility study?

Because the decisions that control cost are made before drawings start. A study of zoning capacity, buildable area, utilities, approval route and construction cost costs a fraction of a design fee, and it is the only stage where a project can be changed or stopped cheaply.

What do I receive?

A written report: what the code and applicable state law allow, what fits on the site after real constraints, an order-of-magnitude construction cost range with the major drivers priced, the approval route with a realistic schedule, and a recommendation with the risks named.

Can I take the study to another designer or contractor?

Yes. It is written to be handed to a lender, partner, designer or general contractor, with assumptions stated so anyone can test them.

How is this different from a free estimate?

A free estimate is a sales tool built on assumptions. A feasibility study is paid research: the site is examined, the code is applied, and the number comes with the reasoning attached.

How long does a feasibility study take?

Most studies are delivered in a matter of weeks, depending on how much survey, title or agency information already exists for the property.

Request a feasibility review

Tell us the property and what you are considering. You will get a scoped study proposal with a fixed fee, the deliverables listed and a delivery date, not a sales call.